Established in 1998, Seob has been leading the localization and globalization of general temporary and specialized construction materials by effectively utilizing its differentiated quality management and ceaseless research and development (R&D).
Seobo¡¯s flagship SB system formwork, dubbed as ¡°SB Column Steel Form¡± comprised a reinforced steel panel integrating a steel plate, common joist and sleeper. Unlike existing column formwork, this system form is assembled on the floor in advance and installed on site using equipment.
While the existing column formwork repeats the entire processes of assembly and dismantlement, the SB column steel form is a stable and rapid method because it repeats only the process needed to fasten and loosen the Dywidag bolts of the triangle connector. Work efficiency in repeated formwork process is more than eight times greater with the same labor requirements as the existing column formwork.
The tie-less formwork does not use form tie, thereby reducing costs for installation and removal of form tie after removing forms and shortening the time needed. There is also no need to consider any restrictions in using a tower crane when using lifting equipment for column forms.
Less distortion by lateral pressure of concrete due to superior performances of materials is made possible by using column forms. Seobo further plans to put every endeavor into being the global construction materials specialist enabling the clients to entirely trust its product¡¯s quality applied with highest technology.
|